As global energy markets shift toward decentralized power, commercial and industrial (C&I) facility owners are no longer satisfied with just "selling power back to the grid." The focus has pivoted to Energy Autonomy. Whether you are an EPC contractor or a factory owner, understanding how to integrate storage into an existing PV array is the key to unlocking 24/7 reliability and massive cost savings.
When adding a Battery Energy Storage System (BESS) to a pre-existing solar site, the first technical hurdle is choosing the connection architecture.
For most existing C&I sites, AC-coupling is the most efficient choice. In this setup, the battery system is connected on the AC side of the existing solar inverter.
Pros: No need to disturb the existing PV wiring; compatible with any brand of grid-tied inverter; allows for independent scaling of PV and storage.
Best For: Factories with older, functional solar installations looking for a "plug-and-play" upgrade.
In a DC-coupled system, both the PV strings and the batteries connect to a single Hybrid Inverter.
Pros: Higher round-trip efficiency (fewer conversion steps); lower hardware footprint.
Best For: New installations or sites where the old grid-tied inverters are being replaced by modern high-voltage hybrid units.
Feature | LP-TSI Series (3-Phase Hybrid) | BATTLINK C&I All-in-One ESS | Industrial String Series (Grid-Tied) |
Power Range | 10kW - 30kW (Parallelable up to 300kW) | 35kWh / 50kWh / 100kWh Cabinets | 50kW - 125kW |
Best Application | Retrofitting existing solar sites via AC-Coupling. | New-build energy independence & Peak Shaving. | Large-scale rooftop solar without storage. |
Max. Efficiency | 98.2% | Up to 99% (System level) | 98.8% |
Battery Compatibility | High-Voltage LiFePO4 (160V-800V) | Integrated LFP (Grade A Cells) | N/A (Solar Only) |
Switching Time | <10ms (UPS Grade) | <10ms (Seamless) | N/A |
Protection | IP66 (Outdoor Rated) | IP54/IP55 (Industrial Cabinet) | IP66 |
Key Advantage | Supports both DC and AC coupling for maximum flexibility. | Plug-and-play; pre-configured EMS for Peak Shaving. | Multi-MPPT for complex factory roof layouts. |
Why are B2B clients investing in storage now? The answer lies in the demand charge—the portion of a commercial bill based on the highest point of energy usage.
Strategy | How it Works | Financial Impact |
Peak Shaving | Batteries discharge during the factory's highest usage periods to keep grid pull below a specific threshold. | Reduces "Demand Charges" which can account for 30-70% of a commercial bill. |
Load Shifting | Storing solar energy during the day and using it at night or during peak-rate hours. | Maximizes self-consumption and avoids expensive "Time-of-Use" (TOU) rates. |
Pro Tip: Modern C&I hybrid inverters use AI-driven Energy Management Systems (EMS) to predict weather patterns and factory loads, ensuring the battery is always ready for the next peak.
Transitioning to a hybrid system isn't just about adding batteries; it requires a sophisticated control layer:
High-Voltage Compatibility: C&I systems typically require high-voltage (HV) battery stacks (300V-800V) to minimize cable losses and improve inverter efficiency.
Sub-10ms Switching: For industrial facilities with sensitive machinery, the inverter must act as a UPS (Uninterruptible Power Supply), switching to battery power instantly during a grid outage.
EMS Integration: The inverter must communicate via RS485 or CAN bus with both the Battery Management System (BMS) and the factory's SCADA system.
The transition from simple grid-tied PV to a robust C&I Hybrid Storage system is the most effective way to hedge against rising energy costs. By choosing the right coupling architecture and prioritizing peak-shaving capabilities, businesses can transform a passive rooftop asset into an active revenue-saving machine.
As a leading manufacturer of High-Power C&I Hybrid Inverters and All-in-One BESS Cabinets, our engineering team provides full system design support for your retrofitting projects.
Would you like a free technical consultation for your next 100kW+ project?